52 Area Drainage Study for Plant and Ash Dyke for Patratu Super Thermal Power Project NTPC Ltd Corporate Office NOIDA Rs 20.0 Lacs Sept-Dec,2016 UC Chaube (Ext Expert), A Pandey In Progress
51 Identification  of  alternate surface water storage schemes for Deoghar Ultra Mega Power Project Power Finance Corporation Consulting Ltd New Delhi Rs 52.0 Lacs Jan,16 to June,2017 UC Chaube (Ext Expert), A Pandey In progress
50 Ash dyke breach analysis of ash dyke embankment of Gadarwara STPP(MP) NTPC Ltd Corporate Office NOIDA Rs 40.70 Lacs Jan,2016 to Jan,2017 UC Chaube (Ext Expert), S.K. Mishra, A Pandey  In progress
49 Area drainage and flood control study of  20MW solar plant-Andaman islands NTPC Ltd- Southern Region HQ Hyderabad Rs 26.16 Lacs Dect,15 to Dec,2016 UC Chaube, S.K. Mishra, A Pandey   Completed
48 Hydrogeological study of Pudimadaka Super  Thermal Power Project-Visakhapatnam(Andhra Pradesh) NTPC Ltd, Southern Region HQ Hyderabad Rs 65.36 Lacs July,15 to June,2017 UC Chaube, A Pandey  Completed
47 Hydrogeological study of Telengana Super  Thermal Power Project-Ramagundam(Telengana) NTPC Ltd, Southern Region HQ Hyderabad Rs 67.33 Lacs July,15 to Dec,2016 UC Chaube(Ext Expert), A Pandey  In progress
46 Area drainage and storm water conservation study of Pudimadaka Super Thermal Power Project NTPC Ltd Corporate Office NOIDA Rs 45.37 Lacs August,15 to August,2016 UC Chaube, S.K. Mishra   Completed
45 Area drainage  study of Buxar Thermal power project(Bihar) SJVN Thermal Private Ltd Rs 22.57 Lacs June,15 to June,2017 UC Chaube, S.K. Mishra   Completed
44 Hydrogeological study of Lara Super  Thermal Power Project(Chhattisgarh) NTPC Ltd,Raipur(Chhattisgarh)  Rs 63.08 Lacs May,15 to Dec 2016 UC Chaube, A Pandey  Completed
43 Hydrogeological study of Barethi Super  Thermal Power Project(MP) NTPC Ltd,Barethi(M.P.)  Rs 65.36 Lacs May,15 to Dec2016 UC Chaube, A Pandey  Completed
42 Hydrogeological study of Feroz Gandhi Thermal Power Project(Unchahar)- Stage IV  NTPC Ltd,Unchahar, Raibareili(U.P.)  Rs 58.42 Lacs Feb,15 to Dec2016 UC Chaube, A Pandey  Completed
41 Review of structural designs of  two irrigation schemes in Nadaun (HP) M/s Jain Irrigation Systems Nadaun (HP) Rs 5.06 Lacs Jan,15 to Jan,2016 UC Chaube, S.K. Mishra   Completed
40 Surface Runoff study of independent  power plant ,Jharsuguda(Odissa) M/s Vedanta Ltd Jharsuguda Rs 98.07 Lacs Dec,13 to June,2016 UC Chaube, UC Chaube(Ext Expert), S.K. Mishra,  D Khare, A Pandey In progress
39 Prel feasibility study of Artificial Lwali lake Pauri Garhwal District(UK) Uttarakhand Irrigation Department Rs 15.17 Lacs Jan,15 to Dec 15 UC Chaube, A Pandey Completed
38 Hydrological and area drainage study of  project sites in Lekki Free Trade Zone,Lagos(Nigeria) M/s Dangote Oil Refinery Co Ltd,Nigeria US $ 50562.0 August,2014 to June,2015 UC Chaube, A Pandey  Completed
37 Water availability in upstream of Kewtar barrage on river Sone MB Power (MP) Ltd., New Delhi Rs.4.50 lacs 2 months, 11.06.12 to 31.07.12  UC Chaube, S.K. Mishra   Completed
36 Conceptual water availability and intake point study for proposed 1320 MW TPP at Distt. Deogarh, Jharkhand Dalmia Power Ltd., New Delhi Rs.9.85 lacs 1 year, 01.08.12 to 01.08.13  UC Chaube, S.K. Mishra, A. Pandey Completed
35 Cumulative impact assessment study for hydropower development WAPCOS, Gurgaon Rs.8.80 lacs 1 year, Aug. 16, 12 to Aug. 16, 13  UC Chaube, S.K. Mishra   Completed
34 Water Availability Study of Patratu Reservoir and Related Thermal Power Plants. Power Finance Corporation, New Delhi Rs.20.00 Lacs May 15, 2012 to May 15, 2013 UC Chaube, S.K. Mishra, A. Pandey Completed
33 Water availability study for 2nd Jharkhand UMPP (4000MW) from Ajay river in Deoghar district of Jharkhand & preparation of detailed project report. Power Finance Corporation, New Delhi Rs.39.75 Lacs. May 15, 2012 to May 15, 2013 UC Chaube, S.K. Mishra, A. Pandey Completed
32 Area Drainage Study for Plant and Ash Dyke for Gadarwara Super Thermal  Power Project (4x660 MW). NTPC Ltd, Noida Rs. 11.18 Lacs Sep  12, 2011 to Oct. 31, 2012 UC Chaube, S.K. Mishra, A. Pandey  Completed
31 Area Drainage Study for Plant and Ash Dyke for Barethi Super Thermal Power Project (6×660 MW) NTPC Ltd, Noida Rs. 14.47 Lacs Sep  12, 2011 to Oct. 31, 2012 UC Chaube, S.K. Mishra, A. Pandey Completed
30 Identification of water source for power plant linked to Mourya coal block (Jharkhand) Power Finance Corporation, New Delhi Rs.10.0 Lakhs 1.07.10 to 30.04.11 UC Chaube, S.K. Mishra, A. Pandey Completed
29 Water and Waste Water Audit National Aluminum Company(NALCO), Angul Rs. 89.00 lacs 15 months (Sept. 10 to Mar 12) U.C. Chaube (PI), SK Mishra, CSP Ojha, Ashish Pandey Completed
28 4-week training on ‘Design of small dams’ (T-822) Govt. of Afghanistan Rs. 18.23 lacs 2011, 1 month UC Chaube, SK Mishra Completed
27 Four-week training on ‘River basin planning’ (T-821) Govt. of Afghanistan Rs. 18.23 lacs 2011, 1 month UC Chaube, SK Mishra Completed
26 Development of teaching scheme for course on Inland Waterways Development National Inland Navigation Institute, Patna Rs. 4.9 lacs 2011, 3 months UC Chaube, SK Mishra Completed
25 Short Term Course on River Training Works  Inland Waterways Authority, N. Delhi. Rs. 3 lacs 2010, 1 month UC Chaube, SK Mishra Completed
24 Site visit and review of area drainage study of Tilda TPP (Chhattisgarh) GMR Chhattisgarh Pvt Ltd Rs. 2.50 Lakhs 13.08.10 to 30.04.11 U.C. Chaube,  A. Pandey  Completed
23 Birra TPP(Chhattisgarh)-Review of Water availability Hydrogeology and Area drainage MoserBaer, New Delhi Rs. 1.875 Lakhs 13.01.10 to 31.08.2010 U.C. Chaube,  A. Pandey  Completed
22 Raigarh TPP(Chhattisgarh)-Review of Hydrology, Hydrogeology and Area drainage Visa Power Ltd,Kolkata Rs. 2.7575 Lakhs 15.03.10 to 30.09.10 U.C. Chaube, A. Pandey  Completed
21 Water availability study for Chitrangi thermal power project Reliance Energy Centre,Mumbai Rs. 19.19 Lakh 1.06.2010 to 30.04.11 UC Chaube ,S.K. Mishra, A. Pandey  Completed
20 Gidderbaha TPP-Area Drainage Design Pvt. Ltd. Rs. 9.0 Lakh 2008 (12 months) UC Chaube, A Pandey  Completed
19 Anuppur Thermal Project– Review of Report  Moserbaer New Delhi Rs. 1.65 lacs Sept 09 to Mar  10 U.C. Chaube  Completed
18 Short Term Course on Project Management for River Valley Projects NHPCL, Faridbad   Rs. 3.50 lacs 21 to 25 Oct. 09 UC Chaube, S.K. Mishra   Completed
17 Short Term Course on River Training Works  Inland Waterways Authority, N. Delhi. Rs. 2.70 lacs 07 to 11 Oct. 09 U.C. Chaube , S.K. MIshra,  Completed
16 Chhattisgarh Ultra Mega Power Project – Water Availability Study Power Finance Corporation-Govt. of India, New Delhi Rs. 1630000.00 10.06.2008-31.10.2008 UC Chaube, A Pandey Completed
15 Conservation Plan for Kshipra River Commissioner Nagar Palika Nigam Ujjain Rs. 7684231.00 15.02.2008 to 31.03.2009 UC Chaube, Arun Kumar, D Khare and others Completed
14 Jharkhand Ultra Mega Power Project – Area Drainage and Hydrological Study Desein Private Limited, New Delhi Rs. 1459900.00 14.12.2006 to 14.03.2007 U.C.Chaube Completed
13 Sasan Ultra Mega Power Project (M.P.) - Study on Hydrology and Impact of Ashpond Leachate Desein Private Limited, New Delhi Rs.781190.00 01.05.2006 to 30.06.2006 U.C.Chaube Completed
12 Sasan Ultra Mega Power Project (M.P.) - Area Drainage Study Desein Private Limited, New Delhi Rs.802516.00 24.03.2006 to 31.05.2006 U.C.Chaube Completed
11 Design and Construction of Hydroelectric Projects Including Pump Storage Scheme– Specialist Training Course for CWC Engineers Central Water Commission, Govt. of India Rs 3.12 Lakhs 23.01.2006 to 03.02.2006 U.C.Chaube Completed
10 Tunnels and Underground Structures – Specialist Training Course for CWC Engineers Central Water Commission, Govt. of India Rs 3.12 Lakhs 28.11.2005 to 09.12.2005 U.C.Chaube Completed
9 Evaluation Study of Rural Infrastructure (Irrigation) Projects in Sagar District of Madhya Pradesh National Bank for Agriculture and Rural Development, Mumbai Rs. 4.68 Lakhs Oct, 2005 to 31-03-2007 U.C.Chaube Completed
8 Study on Sustainable Development of Flora Fauna Ecology and Needs of    Local Community due to Diversion of Satlaj River Flood for NJHEP Satluj Jal Vidyut Nigam Ltd. Shimla Rs. 7, 16,300.00 04-02-2005 to 30-04-2007 U.C.Chaube, S.K.Mishra Completed
7 Planning and Implementation of Study Tour cum Training Program Small Scale Irrigation Development for Batch-1 Ghana Irrigation Development Authority, Ghana Rs.6.14 Lakhs 29.11.04 to 14.12.04 U.C.Chaube Completed
6 Augmentation of Source, Water Conservation and Recharge – Preparation of DPR for Dehradun and Almora Uttaranchal Peyajal Sansthan Vikas Evaon Nirman Mandal Rs.15.75 Lakhs March  2003 to April 2005 U.C.Chaube, D.Khare Completed
5  Rainwater harvesting in Chambal Fertilizer and Chemical Limited – Kota Chambal Fertilizas and Chemical Limited – Kota Rs.1,62,000.00 25.11.2003 to 31.5.2004 U.C.Chaube, D.Khare Completed
4 Preparation of preliminary Feasibility reports of Nine Hydro Electric     Projects in Uttaranchal. Uttaranchal Jal Vidyut Nigam Limited. Rs. 54.0 Lakhs 14.8.2003 to 31.12.2004 U.C.Chaube, R.P.Singh, D.Das Completed
3 Design and drawing for protection work downstream of  Babail Power  House Uttar  Pradesh Jal Vidyut Nigam Limited Rs.65, 000.00 21.4.2004 to 31.7.2004 U.C.Chaube, Dr Bharat Singh  
2 Study of minimum discharge in Suketi Khad for carrying sediment dredged from balancing reservoir Bhakra Beas Management Board Chandigarh Rs.100, 000.00 25.8.2003 to 31.12.2003 U.C.Chaube, G.Chauhan, B.N.Asthana  
1 EIA of NTPC Super Thermal Power Project Mangalore M/s Envirotech Consultants Pvt. Ltd., New Delhi Rs.15, 500.00 17.11.1990 to 19.8.1991 U.C.Chaube  
header_BSBE
header_BSBE